BASIC PROBLEMS IN THE STAGE-BY-STAGE DEVELOPMENT OF THE TRANSPORT NET IN THE ZONE OF THE BAIKAL-AMUR MAINLINE |
| |
Authors: | R I Vasil'yeva |
| |
Institution: | Central Economic Research Institute , Gosplan RSFSR |
| |
Abstract: | The evolution of the transport net within the BAM zone is examined in terms of three development stages. The first stage will involve the construction of the initial framework of the future transport net; aside from the BAM itself, it is recommended that consideration be given to the construction of a permanent motor road instead of the temporary construction road now envisaged. The second stage, in the author's view, should include the start of an extension of the Little BAM northward toward Yakutsk, as well as an oil pipeline (the author does not agree with the view that the BAM would replace earlier plans for a Trans-Siberian pipeline). The third stage would include a gas pipeline from the Yakutian fields to the coast; it is recommended that the gas line follow the alignment of the new railroads. No specific time frame is attached to the proposed three development stages. |
| |
Keywords: | |
|
|