首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
  2016年   1篇
排序方式: 共有1条查询结果,搜索用时 15 毫秒
1
1.
This article presents the analysis of the structure of Mallorca Cathedral taking into account the influence on the structural behavior of auxiliary iron ties used during the construction process. Recent studies (Roca et al. 2012, 2013) presented some hypotheses about the construction process of the cathedral. This article complements the previous results by considering the use of auxiliary ties as temporary stabilizing device during the construction. Evidence of the use of ties during the construction has been recognized after a comprehensive survey. The study of the role of such ties and the effect of their later removal are studied by a FE analysis carried out on a representative bay of the structure. The study includes a time-dependent FE analysis after the removal of the ties to assess the long-term structural behavior. The results of the numerical analysis are compared with the deformation trends identified by means of a recent monitoring campaign.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号